We only have verbal updates from Troy regarding the sprinkler installation, but we hope pictures are coming soon. The street excavation commenced this week. A medium-size backhoe dug the hole in the street and put the earth in a big dump truck. Both these are parked in the street overnight with traffic cones channeling cars down to a single lane. There are thick steel plates over the hole. The City began tapping the water main yesterday and installed a large valve on the lateral.
More to come soon!